PR
PlantReady
Staff sign in

Plant pre-start platform

Every machine checked. Every fault on record. Even with no signal.

Operators complete pre-starts on phones and tablets in the field. Critical faults lock the machine out until a supervisor releases it.

Works offline

Download your site pack, then inspect, photograph and sign with no connection.

Guided checklists

Versioned templates per machine type with large Pass / Fail / N/A controls.

Critical lockout

Critical failures stop the machine and require supervisor-authorised release.

Rectification trail

Repairs, parts, approvals and status changes are logged and auditable.

PlantReady supports your site's pre-start process. It does not replace isolation, tag-out, supervisor notification or any statutory or manufacturer requirement.